Infrastructure News
Latest operational updates on port facilities, dredging, and access roads across the region.
San Lorenzo
New Berth Expansion at Terminal 6
Terminal 6 has announced the completion of its new berth extension, increasing capacity for Panamax vessels. The project adds 120 meters of operational length and improves the overall turnaround time for loading operations.
View Details →Northern Access Road Repairs
Maintenance work on the main northern access road has begun, aiming to reduce truck congestion during the peak harvest season. Works are expected to be finalized before the start of the upcoming wheat campaign.
View Details →Rosario
Dredging Operations Update
Local dredging activities have successfully maintained a stable 10.5m draft across the main channels despite lower river levels up north, ensuring safe navigation for deep-draft bulk carriers.
View Details →Customs Facility Upgrade
The new automated customs clearance facility has officially opened, integrating seamlessly with the port’s digital tracking system to drastically reduce paperwork delays.
View Details →Bahía Blanca
Grain Elevator Modernization
Major investments in the main grain elevators have boosted the loading rate by 20%. The new conveyor belt system reduces dust emissions and optimizes the loading sequence for larger vessels.
View Details →
